Take a look at our great projects with high-quality
On 27/7/2023 the project of supplying a mobile sub-station of 25 MVA for Choman-prdi Hafiz has been inaugurated in Sulaymaniyah- Iraq with the presence of MOE Manager and its staff , which was funded by Kurdistan regional government.
Ongoing project……
In 2023 IDIOM company started a project of adding 11/33kV section with power transformer 31.5MVA-33/11kV, by the representatives of MOE-Sulamaniyah ( as supervision), contractor IDIOM company agreeing that the side has been oficially handed over contractor on sunday 02/04/2023.
In 2022 IDIOM Company has started a project of supplying a mobile sub-station of 25 MVA for choman-Prdi Hafiz, which funded by Kurdistan regional government. Including large request of basic materials such as cooper, silicon paper and top changer. Also the installation of this mobile sub-station has been done by IDIOM Company Team.
Ongoing Project…..
In 2022 IDIOM Company carried out a project of supplying six mobile sub-stations with 25 mVA volume for Duhok governorate, which was funded by the Kurdistan regional government. Including three mobile sub-stations of 132kVA in each of ( Duhok center, Bardarash, And Qasrok). Three other mobile sub–station of 33 kVA in each of ( Akre, Simil, And Zaxo).
In 2019 IDIOM Company started a huge project of installing and replacing new smart meters for all Duhok costumer which included 128000 single-phase and three-phase enclosures. The client for this project was MOE [Ministry Of Electricity] , which has been supervised by the MOE Team. This work has been implemented with cooperation with TL company.
IDIOM Company in 2018 has done a project of delivering 2 feeders to the derelok station 132 kV, Delivering 33 kV single and cables line to derelok with a length of 1000m, Also delivering 33 kV single circuit from 132kV derelok station with a length of 700m.
IDIOM Company carried out a project in 2019 which was funded by Kurdistan Hospital. The rule of IDIOM Company in this project was connecting the electricity 11kV line on extracting feeder ( 358) of 1000kV transformer from the power station of Tanahi to the borders of Kurdistan Private Hospital, Also supplying and installing a kiosk of 1000 kVA to the hospital with installing all needed types of equipment.
This project has been done in 2018 funded by the electricity distribution directorate of Duhok in Etit-Duhok. The work was extracting seven feeder stations of ( 11/33/132 kV Lines), With high attention to the inspection of all the equipment with Processing materials according to technical specifications.